Permit Requirements in Montgomery, TX
Permit guideGeneral Texas guidance · not city-verified
- Type
- City
- Population
- 3,105
- County
- Montgomery
- Profile
- Small city
What to expect here
Permitting is often handled by city hall staff, with plan review and inspections contracted to a third-party inspection firm.
Permits commonly required
Site plan, construction drawings, energy code compliance, and often engineered foundation plans.
Structural changes, new rooms, garage conversions. Cosmetic work (paint, flooring, cabinets) usually exempt.
New circuits, panels, service upgrades, generators, EV chargers. Work by a TDLR-licensed electrician.
Water heaters, re-pipes, sewer/gas lines. Licensed through the Texas State Board of Plumbing Examiners.
Replacement or new systems; contractor must hold a TDLR air conditioning & refrigeration license.
Many cities require a permit for re-roofs, especially in hail and windstorm areas.
Height limits and setback rules are common; walls over ~4 ft often need engineering.
Barrier/fence and alarm requirements, plus electrical and plumbing permits.
Utility disconnects and, for commercial buildings, an asbestos survey (TDSHS).
Size, placement, and lighting limits. TxDOT approval if near a state highway.
City permit for curb cuts; TxDOT permit if connecting to a state road.
Needed for new buildings and commercial tenant/use changes.
Step-by-step process
- 1Confirm jurisdiction
Verify the property is inside city limits (not just the ETJ or unincorporated county) using the appraisal district map.
- 2Check zoning & deed restrictions
Review setbacks, use rules, and any HOA covenants before drawing plans.
- 3Prepare documents
Application, site plan, drawings, contractor registrations, and proof of ownership.
- 4Submit & pay fees
Online portal or city hall counter. Fees are usually based on valuation or square footage.
- 5Plan review
Reviewer comments may require revisions; respond promptly to keep your place.
- 6Inspections
Typical sequence: foundation, framing, rough MEP, insulation, final. Keep the permit card posted.
- 7Final approval
Receive final inspection sign-off or certificate of occupancy before use.
Codes & Texas state rules
- Texas cities apply the International Residential Code for homes (Local Government Code ch. 214) and generally adopt ICC codes plus local amendments — check which edition Montgomery uses.
- Cities may not regulate exterior building materials beyond national codes for most residential and commercial buildings (HB 2439, 2019).
- Septic (on-site sewage) systems fall under TCEQ rules, often administered by Montgomery County where city sewer is unavailable.
- Properties in a FEMA flood zone need a floodplain development permit from the local floodplain administrator.
- Homeowners may often pull permits for work on their own homestead; trades work for hire requires a state license.
Other agencies that may be involved
- Montgomery County
Floodplain, septic, and unincorporated/ETJ areas
- TDLR
Electrician, A/C, and accessibility (TAS) for commercial projects
- TxDOT
Driveways, signs, and utilities along state highways
- TCEQ
Septic, stormwater (construction over 1 acre), water wells